Complete our new e-learning module to get up to date with key changes in the latest mandatory Design and Construction Guidance (DCG) for adoptable foul and surface water sewers that came into effect in April 2020. This guidance is for use by developers when planning, designing and constructing foul and surface water drainage systems intended for adoption under a section 104 agreement.
This training module will get you up to date with key changes in the latest mandatory Design and Construction Guidance (DCG) for adoptable foul and surface water sewers that came into effect in April 2020. This guidance is for use by developers when planning, designing and constructing foul and surface water drainage systems intended for adoption under a section 104 agreement.
This chapter will cover how the new Design and Construction Guidance applies to pipes and their use as part of foul and surface water drainage systems intended for adoption under a section 104 agreement.
There are also some changes affecting inspection chambers which are highlighted in this chapter. These changes regarding specification are small but important.
The changes to surface water are some of the most significant changes in the new code. Chapter 3 explains what these changes are and their implications for adoption of surface water components by WASCs.
As part of the new code geo-cellular tanks are now included as adoptable assets. This chapter discusses the key requirements and the six criteria that a developer will need to comply with in order for it to be adopted by the water company.
In this chapter you will find some useful links to find further information on the new code.
Complete the assessment to check your understanding of the content covered in this module
Wavin is part of Orbia, a community of companies working together to tackle some of the world's most complex challenges. We are bound by a common purpose: To Advance Life Around the World.